Banner Portal
Target Value Design in the design management process through simulation: difusion of concepts and theoretical insights
PDF (Português (Brasil))

Keywords

Target Value Design. Design Process. Simulation.

How to Cite

OLIVA, Carolina Asensio; MELO, Reymard Savio Sampaio de; GRANJA, Ariovaldo Denis. Target Value Design in the design management process through simulation: difusion of concepts and theoretical insights. PARC Pesquisa em Arquitetura e Construção, Campinas, SP, v. 6, n. 1, p. 4–15, 2015. DOI: 10.20396/parc.v6i1.8634989. Disponível em: https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634989. Acesso em: 30 jun. 2024.

Abstract

Cost have a significant impact not only in the design process itself but also in the final architectural solution. Target Value Design (TVD) can be a promising approach to make cost and value in the client’s or end-user’s perception drive the design process. The research aimed to introduce basic TVD concepts for teams involved in the design process management of real estate products and to allow theoretical insights of its adoption in this situation. The research method consisted of a simulation in both academic and corporate environment, in two rounds, the first one simulated the Design-Bid-Build (DBB) process and de second one using the TVD approach. The results from the second round (TVD), where a cost constraint was imposed, led to apparent simplification of the model. TVD demands change in the design process, and the most challenging one is the cost as a driver to design process, instead of an output of it.

https://doi.org/10.20396/parc.v6i1.8634989
PDF (Português (Brasil))

References

AIA (The American Institute of Architects). Integrated Project Delivery: A Guide. 2007. Disponível em: http://www.aia.org/contractdocs/aias077630. Acesso em: Jun. 2014.

BALLARD, Glenn. The last planner system of production control. 2000. 192f. Tese (Doutorado) – School of Civil Engineering, The University of Birmingham, Birmingham, 2000.

BALLARD, Glenn; REISER, Paul. The St. Olaf College Fieldhouse project: a case study in designing to target cost. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 12, 2004, Helsingor. Proceedings …. Helsingor: IGLC. Disponível em: http://www.iglc.net/papers/Details/325. Acesso em: Jun. 2014.

BALLARD, Glenn. Target value design: current benchmark. Lean Construction Journal , 2011. p. 79-84. Disponível em: http://www.leanconstruction.org/media/docs/lcj/2011/LCJ_11_009.pdf. Acesso em: Jun. 2014.

CERON, Luciana Cristina. Notas sobre concepções de preço e valor nos custos da Arquitetura. 2011. Dissertação (Mestrado em Arquitetura, Urbanismo e Tecnologia) - Escola de Engenharia de São Carlos, Universidade de São Paulo, São Carlos, 2011. Disponível em: http://www.teses.usp.br/teses/disponiveis/18/18141/tde-07072011-104055/. Acesso em: 2015-06-12.

COOPER, Robin; SLAGMULDER, Regine. Target Costing and Value Engineering. Portland, USA: Productivity Press, 1997.

DENEROLLE, Stéphanie. The application of Target Value Design to the design phase of 3 hospital projects. Technical Report. Project Production Systems Laboratory. University of California, Berkeley. Janeiro, 2013.

DO, D.;CHEN, C.;BALLARD, G; TOMMELEIN, I. Target Value Design as a Method for Controlling Project Cost Overruns. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 22., 2004, Oslo. Proceedings …. Oslo: IGLC. Disponível em: http://www.iglc.net/Papers/Details/1065. Acesso em: Jun. 2014.

FELLOWS, R.; LIU, A. Research Methods for Construction. Wiley-Blackwell, 2008.

JACOMIT, Ana Mitsuko; GRANJA, Ariovaldo Denis. An investigation into de adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, v. 7, n. 2, p. 113-127, 2011. http://dx.doi.org/ 10.1080/17452007.2011.582334

LIKER, Jeffrey K. The Toyota Way. 14 Management Principles from the World´s Greatest Manufacturer. Estados Unidos: McGraw-Hill, 2004.

MACOMBER, H.; HOWELL, G.; BARBERIO, J. Target‐Value Design: Nine Foundational Practices for Delivering Surprising Client Value. The American Institute of Architects, Practice Management Digest, winter, 2007.

MELHADO, Silvio; EVETTE, Thérèse; HENRY, Eric; FABRICIO, Márcio Minto; SEGNINI Jr., Francisco; LAUTIER, François. Uma perspectiva comparativa da gestão de projeto de edificações no Brasil e na França. Gestão e Tecnologia de Projetos. São Carlos, v.1, n.1, novembro 2006.

MUNANKAMI; Manish B. Development and Testing Of Simulation (Game) To Illustrate Basic Principles Of Integrated Project Delivery And Target Value Design: A First Run Study. 2012. Dissertação (Mestrado) - Texas A&M University, 2012, College Station.

ROMANO, Fabiane V. Modelo de Referência para o Gerenciamento do Processo de Projeto Integrado de Edificações. 2003. 326 p. Tese (Doutorado) - Programa de Pós-Graduação em Engenharia de Produção, Universidade Federal de Santa Catarina, Florianópolis.

RYBKOWSKI, Z. K.; MUNANKAMI, M.; GOTTIPATI, U.; FERNANDEZ-SOLIS, J.; LAVY, S. Toward an understanding of cost and aesthetics: Impact of cost constraints on aesthetic ranking following target value design exercises, Proceedings IGLC, Lima, Peru, July 13-15, 2011, pp. 448-457.

PENNANEN, Ari; BALLARD, Glenn; HAAHTELA, Yrjänä. Designing to targets in a target costing process. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 18., 2010, Haifa. Proceedings …. Haifa: IGLC. Disponível em http://www.iglc.net/Papers/Details/675. Acesso em: Jun. 2014.

PISHDAD-BOZORGI, Pardis; MOGHADDAM, Ehsan Hamzanlui; KARASULU, Yilmaz. Advancing Target Price and Target Value Design Process in IPD Using BIM and Risk-Sharing Approaches. In: ASC ANNUAL INTERNATIONAL CONFERENCE & CIB COMMISSION W089, 49., 2013, San Luis Obispo. Proceedings …. San Luis Obispo: ASC.

SAVAGE; Justin C. D, MILES; Christopher. The interaction of time and cost constraints on the design process. Design Studies. v. 19, n. 2, p. 217-233, abr. 1998.

ZIMINA, Daria; BALLARD, Glenn; PASQUIRE, Christine. Target value design: using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, v. 30, n. 5, p. 383-398, abr. 2012. http://dx.doi.org/ 10.1080/01446193.2012.676658

I accept that PARC Research in Architecture and Building Construction journal perform, on the original file approved for publication, revisions and modifications in orthoghaphic, grammar and standard issues.

I give to PARC Research in Architecture and Building Construction journal the rights of first publication of the revised version of my paper, licensed under the 'Creative Commons Attribution' license (which allows sharing the work with the recognition of first authorship and publication in this journal).

Downloads

Download data is not yet available.